Partial production line and inspection equipment displayed as below, welcome your email to ask for details:
-How to get a quote ?
How long can we get a response and quote?
guaranteeand reliability test such as EQC, IQC, PQC, FQC, FQA, physical lab and chemical lab . AOI inspection, AVI(Auto visual inspection), electrical testing, Automatic warping test , Automatic hole inspection, Ionic contamination test, Hole and surface Copper tester, Solderabilty testing, Micro-section making and measurement, Rohs tester, Metal thickness tester for gold boards, Impedance tester for impedence control if needed, 1000X metallographical microscope, KEYENCE microscope to measure the roughness if neeeded and dimension control of X-Y measuring machine and KEYENCE full dimension checker.
Do I need to pay fixture for electrical testing ?
Samples: 4-10 days, mass qty: 2-4 weeks according to the material type and layer counts. The lead time for special requested material and design could be extended if needed , but urgent parts will be shortened with production lead time.