Home
/
Categories
/
Measurement & Analysis Instruments
/
Measuring & Gauging Tools
/
Other Measuring & Gauging Tools
/
Automatic Road Measurement Analyzer
Automatic Road Measurement Analyzer
FOB Price
Korea (North)
Main Products : pavement management system, ROMA153, Pavement Measurement Analyzer, pavement surface investigation
#405 World Meridian Biz Center, 15-1, Yangpyeng-dong 3-ga Yeongdeungpo-du, Seoul
Automatic Road Measurement Analyzer Details
Model Number
ROMA-153
Automatic Road Measurement Analyzer Introduce

Features

This system is to survey the pavement surface distress level and condition, which are the main input for the network and the project level in PMS(Pavement Management System).

This system consists of 1) one investigation vehicle, 2) a set of investigation processing equipment, and 3) the High Speed Computer and Server computer for the data processing and reduction.

The investigation items should include a series of pavement surface distress survey, rut depth survey and International Roughness Index(IRI).

The system is Laser Camer and controller and Recording System in order to survey the pavement surface distress and rut depth and transverse vertical depth and each system included the software to reduce and analyze the data surveyed.

The investigation vehicle includes a series of pavement surface recorder system, transverse cross profile recorder system and a distance measuring instrument(DMI) and GPS and recorder system

The investigation vehicle can be operated at day and night without the controlled lighting system.

Specifications

1 Investigation Vehicle(Any model can be applied)

1) Vehicle(Typical model is presented as follows) 1 Set

Complete vehicle with the form admission or structure modification admission in compliance with Each nation vehicle control law and atmospheric environment and noise regulation.

Weight : 5,130 Kg

Dimension (LxWxH)mm : 5125 x 1920 x 2000

Engine Displacement : 4000cc

Hill-climbing ability (Tan θ : 25%)

Interior space should be enough to mount the equipments required and floor finish with carpeting.

One or Two entrance doors

Air conditioning

AM/FM Stereo Cassette and CD Player

Insulation : Floor, Sides, Rear & roof

Work table

System rack

Ladder access to roof

Power Brake and power steering

Storage Area

Equipment Rack

Revolving light

Illuminated Sign Board

Conference Room

2) Generator 1 Set

4 Cycle Gasoline or light oil engine

Pressure Air Cooled

1 or 3 Phase, 5KW, 60Hz

Industrial Muffler

High Air Temperature Shutdown

Air Discharge Duct Adaptor

3) Power Distribution Control Panel 1 Set

Power Supply : AC 220V, DC24V, DC12V

Output : Protected with NFB

Power Supply on/off switch

Adjustable Voltage(with Inverters)

4) Sensor boxes within front site of Back Tires 1 Set

2 Surface Distress Survey System

2.1 Laser Measurement Image System(LRIS)

1) Specification

Image size : 4096 pixels/line, 28000 lines/s

Image width : 4 m

Laser Class : 3B

Power : 250W

Sensor size : 300mm(H) X 375 mm(L) X 200 mm(T)

Sensor weight : 20kg

Video Disk Recorder (VDR)

2) Distress Recording System

Measuring width : 4.0m

Measuring accuracy : Crack width 1mm

Transverse Resolution : 1 mm

Longitudinal resolution : 1 mm

Maximum measuring speed : 100Km/h

3 Rut Depth Survey System

3.1 LRMS(Laser Rut Measurement System) Specifications

No. of laser profilers : 2

Sampling rate (max.) : 25 profiles/s

Exposure/Laser pulse duration : 0.01 -1.00 ms

Profiles spacing (at 100km/h) : 20 cm

Transverse resolution (max.) : 1280 points/profile

Tranverse field-of-view(nominal) : 4m

Depth range of operation : 750mm

Z-axis(depth) accuracy : 土1mm

X-axis (width) accuracy : 土1mm

Laser profiler dimensions (W X H X D) : 140mmX1052mmX305mm

Power consumption (max.) : 150 W at 120/240 VAC

4 Data Processing & Analysis System

4.1 Pavement Distress & Rut Depth

Analysis System (Laser Camera image recording System & Multi-point displacement system(4m width with 25mm distance-160 points)

- Keyboard Inventory Facility

1 KVM Keyboard

Data Processing Software(KOHAT Crack Analysis Program)

Power Supply

- ROW Measurements

Type which is capable of Saving Images with crack

250 GB HDD

Data Processing Software

- Automated Crack Detection System

Which is capable of detecting Severity, Extent, Orientation

Which is capable of saving and printing the crack map.

4.2 Surface Distress analysis software

Laser Camera Image recording System should provide following analysis software for the surface distresses.

1) Analysis Items

Asphalt Pavement

Fatigue Cracking

Block Cracking

Edge Cracking

Longitudinal Cracking

Transverse Cracking

2) Cracking analysis Items

Crack length

Distribution percentage of Cracking

5 GPS(Global Positioning System)

KOHAT will provide GPS for position coordination for IRI(International Roughness Index) and Rut depth and Pavement distress image and Data Processing & Analysis System

Compact GPS

Summary of Specifications

Classification
Specification
Pavement
surface
distress
survey
system
Distress survey accuracy
(crack width)
Resolving Power =
Transverse
coverage
width
F3.7
Type of camera
Laser Camera
Number of camera
2
Lighting system
Laser light
Size of an image
Above width 3.7m and length 7.5m{about 4mX8m)
Resolution of an image
All collected images shall be with same resolution.
Should detect cracks as small as 1mm at anytime day or night.
Rut Depth
Measurement
System
Vertical Measurement
precision
Less than ±1mm
Longitudinal sampling Interval
Less than 1m
Transverse Sampling Interval
Less than 25mm
Transverse coverage
width
More than 3.7m
Maximum vertical
measurement depth
More than ±7.5cm
Longitudinal
Profiling
System
Measurement
method
Inertia Non contact sensors Method
Survey aocuracy
Less than 0.1mm
Longitudinal
sampling Interval
Less than 25mm
(at 100km/h)
Transverse sampling
number of profiles
per pass
2 points
Position
Confirming
System

Distance Measurement
Instrument (DMI)

Error Tolerance Below 0.5%
Measurement Environment
Anytime day or night
Measurement Speed
(Pavement surface distress survey,
rutting Measurement, Longitudinal Profiling
Measurement)
Max. 100km/h
Chassis

Seating
(With All Measurement
System Installed)

More than 4 seat
Maximum Speed
Fuel Tankage
Max. 100km/h
Diesel/Gasoline
More than 60ℓ
Engine Horsepower
More than 150HP
Overall Length
More than 5,125mm in length(5125mm)
Overall Width
More than 1,920mm in width(1920mm)
Overall Height
More than 1,008mm in height(2000mm)
Wheel Base
More than 3,200mm in distance
Handle Position
Left-Hand
Warning Lights
A unit, Yellow Color, 300candela(CD)
A rotating warming light(Rectangular shape)

Remarks

One year warranty service will be provided.

technical training will be provided by manufacturer's qualified engineer.

Business area

Road/Airport/Railroad/Harbor pavement/ Facilities management and Planning

Pavement management system (PMS) and software development

Railroad roadbed/ Harbor pavement management system development

National road, City, County, Airport pavement management and vicarious execution

Lecture and education for Road and Airport pavement engineers Planning and Research in test pavement of road and airport

Consultation for pavement construction and design

Evaluation of structure stability in railroad roadbed

Laboratory and field test of various pavement materials

Pavement structure evaluation using FWD

Roughness measurement of pavement

Skid resistance measurement of pavement

Pavement distress condition survey

Pavement survey equipment development

Our Client

Nationwide cities, provinces and counties

National road / highway management agencies

Airport and port authorities and operators

Military facility management units

National railroad and local subway authorities

Pavement construction or design companies

Pavement material development & production companies

Universities and Pavement relation laboratories

Achievements & Performance

  • A study on asphalt pavement management system for Seoul Metropolitan City. (1999.11-2000.11)
  • Development of PMS for Incheon International Airport.(2000.6-2000.12)
  • A Initial Pavement Investigation in Incheon International Airport. (2001.3)
  • A Project of Pavement Evaluation in Shinseon Container Wharf. (2001. 12)
  • A Project of Pavement Skid Resistance Evaluation in Jungsuk Airport in Jeju Province. (2002. 6)
  • A Project of Runway Stress-Strain Behavior Analysis in J617-03-2 Airport Construction. (2003. 11)
  • A Pavement Investigation Project in Incheon International Airport. (2004. 12)
  • A Pavement Investigation Project for Kimpo, Ulsan, Kunsan, and Sacheon Airport Runway in Korea Airport Corporation. (2005. 4)
  • A Project on DB Development of Pavement Management System for Seoul Metropolitan City.(1st:2004.5-2005.5, 2nd:2006.9-2007.5)
  • A Project on DB Development of Pavement Management System for Kyonggi Provice.(2005. 10)
  • A Project of Pavement Evaluation in NeongSan-Gil Road for Pavement Extended Construction. (2006. 12)
  • A Delivery for ROMA153 in Korea Airport Corporation. (2008. 12)

Previous : Surface tension meter (DST 30 series) Next : Olympus Epoch 650 Digital Ultrasonic Flaw Detector
Copyright 2023-2024 - www.globalbiz8.com All Rights Reserved