Home
/
Categories
/
Hardware
/
Fasteners
/
Bolts
/
Bolts &Nuts
Bolts &Nuts
FOB Price 0.5 USD / Piece
MOQ
100 Piece
Port
WUHAN
Lead Time
20-25days after deposit
China
Main Products : highway guardrail, post, spacer, terminal end, post cap, scaffolding
Caidian Street Wuhan, Hubei
Bolts &Nuts Details
Brand Name
dachu
Model Number
DC-GI-SD332
Place of Origin
China
Supply Type
OEM Service
Condition
New
Color
Silver
Bolts &Nuts Introduce

1. Standard: DIN931/933/912/DIN603, ASTM, JIS, BSW, Nonstandard bolt (according to your order) and etc.

2. Material and Grade:

1)Material: High quality carbon steel.

Grade: 4.8, 5.8, 6.8, GR.2, A307.

2)Material: Alloy steel :20MnTiB ,40Cr ,42CrMo.

Grade: 8.8, 10.9, 12.9, GR.2, GR.5, GR.8, A325-1, A490-1 , GR.B7, GR.B7M.

3)Material: stainless steel: 302, 304, 305, 316, 304L, 316L, 410, 430. Carbon steel: Grade: A2-50, A4-50, A2-70, A4-70, GR.B8, GR.B8M.

3. Surface Treatment: Part galvanization, Colorful galvanization, Army green galvanization, Black galvanization, Steam Black, Ash phosphorus, Brass, Nickel plate, Chrome plate,

hot dipped galvanized, Zinc plated(yellow, black, green) or according to customers requirements.

4. Size: M6-M64

5. Certificate: ISO9001:2008

6. Packing: 25kgs per carton, 40 cartons per pallet; or 50kgs per gunny bag, 20bags per pallet; or as to customers' requirement.

More about us:

Dachu Guardrail FAQ

Q1: What's your MOQ (minimum order quantity) for guardrails?

A: 4 km or Two full containers of guardrails.

Q2: Are you trade company or guardrail factory?

A: We are guardrail factory, self making and self marketing.

Q3:What's your payment terms for guardrail order?

A: We supply our guardrail by below payment terms:

1)30% in advance by T/T ,70% by T/T before delivery; or

2)30% in advance by T/T ,70% by L/C; or

3)100% by L/C; or

4)Negotiate according to the order status.

Q4: Which delivery terms do you do for guardrails?

A: FOB China port is recommended for guardrails,but CNF/CIF destination port is also acceptable.

Q5: What is the delivery time for guardrails?

A: Normal production time for guardrail sets will be about 35 days, and the final delivery time will be confirmed according to the guardrail order items and quantities.

Q6: Does your guardrail meet EN 1317 Standard ?

A: Yes, we can not only supply guardrail conforming with EN 1317 Standard, but also AASHTO Standard, AS 1594 Standard, and Chinese National Standard etc.

Q7: Can you do the official test for the guardrail order, which authoritative organization is recommend?

A: Yes, the test for guardrail order can be arranged as per requirement, SGS test is recommended, and we could even do the test in the name of your company.

Q8: Can you send us samples before we place the guardrail order, and how to charge it ?

A. Yes, we could send you guardrail samples for free, you just need to pay the postage fee.

How to Place Guardrail Order to Wuhan Dachu

Step 1: Send us inquiry at made-in-china, or send us email or call us at 0086-13517190016;

Step 2: Provide your specification and quantity to us, or we could offer our guardrail product list for your reference to choose;

Step 3: We will made detailed quotation as soon as we receive your specification and quantity;

Step 4: Samples can be arranged if needed, the sample is free to you, you just need to bear the postage fee;

Step 5: Factory visit if possible, you will be warmly welcomed;

Step 6: Confirm the order, we will arrange the production as soon as the advance payment is received;

Step 7: Confirm the delivery time, balance payment need to be arranged before the goods is dispatched;

Step 8: You could contact us for any questions even after sales.

Why Us :

A. We are manufacturer, with competitive price and reliable quality to enable clients to take the projects;

B. We are certificated plant, with various certificates to secure clients' official requirements;

C. We possess our own export qualification and are rich in trade operation to simplify clients' operation.

Contact us immediately for any more doubts about Wuhan Dachu, we would reply your questions in formal methods asap.

Wuhan Dachu Traffic Facilities Co.,Ltd.

(Company Code: 91420114303720312K; Trade Licence Code: 03027006; Customs Code: 420196619D )

Previous : Komatsu D155 Bulldozer Track Shoe Bolt &Nut 175-32-12110 ,178-32-11220 Next : High Quality Hex Bolt DIN931/933/960/961 M6-M10 SS304 SS316
Copyright 2023-2024 - www.globalbiz8.com All Rights Reserved