Home
/
Categories
/
Chemicals
/
Adhesives & Sealants
/
Bottom Coatings - Zinc Anti-corrosive Epoxy Primer(CPM1000)
Bottom Coatings - Zinc Anti-corrosive Epoxy Primer(CPM1000)
FOB Price
Korea (North)
Main Products : Eco-friendly Coatings, Underwater Marcon, river structures, Exposed Coatings, epoxy primer, Bottom Coatings, Emergency Mmaintenance, Middle coatings, Marcon Resin
(2Ba-205,Sihwa Industriak Complex) ,2089-1 ,Jeong2-dong, Siheung-si,, Gyeonggi-do
Bottom Coatings - Zinc Anti-corrosive Epoxy Primer(CPM1000) Details
Brand Name
SCANECO
Model Number
CPM1000
Place of Origin
Korea
Bottom Coatings - Zinc Anti-corrosive Epoxy Primer(CPM1000) Introduce

It is the product for improving durability to minimize the determinants of the service life of (design and construction) and the impact of the deterioration factors (environmental degradation) of chemical plants, steel mills, power stations, pylons and poles, cranes, steel structures in industrial complexes, and for extending the life of steel structures and for extending of commonality.

After repairing and reinforcing fragile site (including damaged area such as welding area, etc) with epoxy resin materials, prevent corrosion of steel surface including the fragile site.

*Korea Patent No. 10-1007507(A anti-corrosive composition for non-ferrous metals and iron structures and the anti-corrosive coating method using the composition)

*Mixing ratio (main component: curing agent:powder) = 3:1:8

Zinc anti-corrosive epoxy coatings are for anti-rust and based on 75μm. Quick hardening, so operational time is short. Anti-oxidation by forming a protective layer on the steel surface. As mildly alkaline, it doesn’t make steel surface oxidized ted ion or aging. Good workability. Epoxies, urethanes, fluorine can be coated over the painting.

Where to Use

Various tanks including fuel tank, etc., water and sewage, gas pipelines, steel pipe, vessels, lock gate, water gate, steel girders for bridges and railway vehicles, power equipment (inlet channel, drainage), industrial machinery

How to Store

Keep the lid closed completely at dry and room temperature be stored away from any source of moisture. Retention period: A year in sealed can

Properties

Test
Unit
Result
Test Method
Mixing Ratio
Base:Hardener:Power
3:1:8
Standard Specification for Highway Bridge :2005
Dry Paint Condition
-
No Defects
Standard Specification for Highway Bridge :2005
Condition of inside the container
-
No Defects
Standard Specification for Highway Bridge :2005
Pot life(Mixing)
h
12
Standard Specification for Highway Bridge :2005
Nonvolatile content(Base)
%
65
Standard Specification for Highway Bridge :2005
Specific Gravity(Base)
-
1.13
Standard Specification for Highway Bridge :2005
Drying Time(Dry-Through)(Mixing)
h
2
Standard Specification for Highway Bridge :2005
Metal zinc of zinc powder
%
92.9
Standard Specification for Highway Bridge :2005
All zinc of zinc powder
%
98.2
Standard Specification for Highway Bridge :2005

Previous : Calcium Formate 98% Next : Chroma Key Cloth Tape
Copyright 2023-2024 - www.globalbiz8.com All Rights Reserved