Precast girder formwork has advantages of high-precision, simple structure,retractile,easy-demoulding and simple operation. It can be hoisted or dragged to casting site integrally, and demoulded integrally or piecemeal after concrete achieving the strength, then pull out the inner mould from the girder. It is handy installing and debugging, low labor intensity, and high efficient.
Product Description
1. Products Name |
Gold supplier supply bridge box girder formwork |
2. Specification |
All size can be available. |
3. Using |
Widely using into construction. |
4. Certificate |
ISO9001 Approved |
5. Features |
1.Enhancing construction efficiency; 2.Guarantee for work safety and quality; 3.Professional mould arrangement sofeware
|
6. Performance characteristics |
1. SAVE 30% man-hours & 50% amortized cost. 2. Easy to installation 3. Fine Brightness and Smoothness |
7. Resist compression |
≥ 5000kgs weight |
8. Resist temperature |
-20°C- 60°C |
9. Packing |
Shrink film or cartons |
10.Productivity |
30000 square meter/month |
11.Unite price/payment |
FOB Tianjin |
12. Origin |
Shandong |
Packing: shrink film or cartons
Shipping: 30 Dayts After Receiving The Deposit&Confirm All Information