Home
/
Categories
/
Telecommunications
/
Fiber Optic Equipment
/
Copper Din Rail for MCB
Copper Din Rail for MCB
FOB Price
China
Main Products : Cable Lug, Din Rail, Copper Busbar
No.230,Wei 20 road, Yueqing, Zhejiang, China Wenzhou, Zhejiang
Copper Din Rail for MCB Details
Place of Origin
China
Supply Type
In-Stock Items
Condition
New
Copper Din Rail for MCB Introduce

You can rest assured to buy CHAER Copper Din Rail For MCB from our factory and we will offer you the best after-sale service and timely delivery. Copper din rail is a type of electrical rail used to mount and support circuit breakers, contactors, and other electrical components. It is made from copper, which is a highly conductive material that allows for efficient power transmission and low resistance. Copper din rail is an ideal choice for MCBs (miniature circuit breakers) as it provides a secure and reliable mounting point for the device.

Essential Details

Standard:

DIN

Rail Heigth:

7.5~15

Web Thickness:

1.0~1.5

Length:

1M~2M, 1M or 2M or Customized

Brand Name:

CHAER

Type:

Light Rail

Weight:

0.16KG

Bolt Hole Diameter:

5.2~6.2

Delivery

Time:

Material:

Aluminum

Certificate:

CE

Grade:

Aluminum

Bottom Width:

27~32

Head Width:

32~35

Place of Origin:

Zhejiang, China

Model Number:

K-5600

Application:

Guide Rail

Secondary Or Not:

Non-secondary

Tolerance:

±1%

Product

name:

Size:

Customize Request

Supply Ability

5000000 Piece/Pieces per Month

Packaging & delivery

Packaging Details:100 pieces in one carton

Port:Shanghai or Ningbo

Lead time

Quantity(pieces)

1 - 50000

>50000

Lead time (days)

15

To be negotiated

Product Information

Product name 

Din rail 

Material 

Aluminum

Width

35mm

Height

7.5mm

Thickness

1.3mm

Length

1M

Packing

100M/PC

G.W.

16kg

Product Show:

Series products

Related Products

Company Information

Certifications

Shipping

FAQ

Q1: Can I have a sample order?

A:Yes. Sample orders for test and quality check are welcomed.

Q2:What the lead time?

A: 3—5 days for samples; 2—3 weeks for mass production as per order quantity.

Q3: How do you ship the goods and how long does it take to arrive?

A: DHL, UPS, FedEx or TNT service for sending samples takes 3—5 days to arrive. Purchase Order delivery by sea and by air (optional as request).

Q4: How to proceed an order?

A:First, tell us your requirements and application.

Then, we offer.

Third, you (the customer) confirm the samples and make deposit for an official Purchase Order.

Finally, we arrange production.

Q5:Are you manufacturer? Where is your factory?

A:Yes. We are in Yueqing, Wenzhou, Zhejiang, China.

Previous : GYTA GYTS GYFTY GYTA53 GYTC8S Gyxtc8s 2- 96core Optical Fiber Cable Next : FBG Pressure Sensor PT-01
Copyright 2023-2024 - www.globalbiz8.com All Rights Reserved