Home
/
Categories
/
Building & Construction
/
Construction Machinery
/
Hitachi CX500 Crawler Crane Track Shoe
Hitachi CX500 Crawler Crane Track Shoe
FOB Price 109 USD / Piece
MOQ
10 Piece
Lead Time
8-15 days
China
Main Products : track shoe, track roller, top roller, idler, sprocket
No.1111, 2nd Building, No.177 Yingchun Road, Laishan District Yantai, Shandong
Hitachi CX500 Crawler Crane Track Shoe Details
Brand Name
VM
Model Number
Kobelco P&H60P P&H70P
Place of Origin
China
Supply Type
OEM Service
Condition
New
Technology
Casting
Heat Treatment
Whole quenching and tempe
Warranty
2500 Working Hours
Hitachi CX500 Crawler Crane Track Shoe Introduce

Hitachi CX500 Crawler Crane Track Shoe

1. Product information

Material: 35SiMn, 28CrMnMo, 31Mn2SiMo

Technology: Casting

Warranty: 2500 working hours

Heat Treatment: Whole quenching and tempering, then surface hardening

2. Related products

3. Some models that we often supply for Hitachi crawler crane undercarriage parts

4.The daily maintenance of Hitachi crawler crane

1) No high speed or sharp turns. When the crawler crane is at high speed or sharp turn, it will cause accelerated wear of the track shoe, pin and bushing, and even lead to cracking of them.

2) Don't overload or drive long distances. The crawler crane does not allow for overload or long distance running, or it will shorten the service life of the track shoe and even cause safety accidents.

3) Don't load unbalance. If the crawler crane is loaded unbalanced for a long time, it will cause premature wear or damage of overload side track shoe.

4)Avoid driving on the float stone. If the crawler crane moves on the floating stone, it will cause the chassis to tilt and cause track shoe to fracture

5. Contact me

QQ: 3203645972 Skype: kira_2077

Wechat/Whatsapp: +86 15063853978

Previous : JK730 Automatic Crawler Mounted DTH Drilling Rig Next : MONDE 20 Tons Excavator Rock Bucket
Copyright 2023-2024 - www.globalbiz8.com All Rights Reserved