Home
/
Categories
/
Business Services
/
Project Cooperation
/
Construction Projects
/
New Chain Type PVD Installation Machine for Ground Improvement
New Chain Type PVD Installation Machine for Ground Improvement
FOB Price 10000 - 50000 USD / Unit
MOQ
1 Unit
Port
Shenzhen Port
Lead Time
15 days
China
Main Products : Wick Drain, Prefabricated Vertical Drain, PVD Rig, PVD Stitcher, Pilling Rigs, PHD, Prefabricated horizontal Drain, Tower Crane
No.506,Building 1,Panshan Chaoneng Pioneer Park,No. 900,North Panyu Avenue,Panyu,Guangzhou,Guangdong Guangzhou, Guangdong
New Chain Type PVD Installation Machine for Ground Improvement Details
Brand Name
HLS
Model Number
MPST-22
Place of Origin
China
Supply Type
OEM Service
Condition
New
Color
Yellow
New Chain Type PVD Installation Machine for Ground Improvement Introduce

Soil improvement using PVD stitcher with prefabricated vertical drain can shorten the path of the pore water in the impermeable soil, accelerate the settlement and reduce the construction period of a project and avoid post-construction diffierential settlements.

a. The Max Height can reach 55m.

b. It is suitable for various kind of Excavator, include the Caterpillar, Hitachi, Komustu, Case, etc.

c. PVD Instalaltion Capacity will be 10000m-15000m/8 hours with the skilled worker.

d. Low noise, Fuel adequacy, Enviromental friendly, Stable Performance.

e. In aviod any rack of the PVD, bending, breaking of the spline shaft.

Previous : River pebble stone Next : Flanged Adaptors
Copyright 2023-2024 - www.globalbiz8.com All Rights Reserved