Home
/
Categories
/
Machinery
/
Plastic Processing Machinery
/
Physical Foaming Coax Cable Extrusion Production Line
Physical Foaming Coax Cable Extrusion Production Line
FOB Price
Port
Shenzhen
Lead Time
15 working days
China
Main Products : cable, machinery, electric wire, extruding machine
Yongtang Rd,Chencun Industrial District,,Humen Town,Dongguan City,Guangdong Province Dongguan, Guangdong
Physical Foaming Coax Cable Extrusion Production Line Details
Brand Name
TAIZHENG
Model Number
TZ-70
Place of Origin
China
Delivery way
FCL or LCL
Production Line Leng
19 Meters at Least
Warranty
3 year
Mainbody color
light grey(Customized)
Installation oversea
provided
Physical Foaming Coax Cable Extrusion Production Line Introduce

Physical Foaming Coax Cable Extrusion Production Line

Applications:

applyt to all kinds of low consumption cored wire extrusion for coax,communication,transmission cable.Such as IEEE 1394,CATE5,CAT6,DVI,ATA,UL2919 foam wire.

common machine model:

A:TZ-35+65 Tend Em Extrusion Physical Foaming Extrusion Line

B:TZ-35+65+40 Triple Layer Physical Foaming Simultaneous Extrusion Line

Main features of production line:

1.Apply to materials:FM-PE,PE

2.Quality standard:reach guild standard.

3.Foaming percentage:

Imported high-pressure nitrogen injection system(Max):82%

Low-pressure nitrogen injection system(Max):75%

4.Quality control:OD tester&capacitance tester selectable,round trip control for OD,foaming percentages etc.

5.Machine head:Equipped with special physical foaming machine head.

6.Electronic control:Imported inverter+PLC touching screen(selective)

7.Selective:High-pressure nitrogen injection system or low-pressure nitrogen injection system.

Remarks

Supply-side required dates and docunments(a&b provide within 7 working days after signed the contract,others attcheh when delivery)

a.full set of equipment installation layout.

b.Water, electricity and gas supply requirements and the amount of interface.

Equipment consumables and wearing parts lists, grades and their origin, vulnerable parts of the provision of spare parts map.

Control components and electrical specifications, models list, Converter Manual.

Electrical schematics, product manual, the ultimate test books, machine operation and maintenance manuals.

Packing List.

Supply-side should provide the service as below: (after deliveryed the machine)

To arrange assistance for installation, adjustment and operating test.

technician arranged to be guided by supplier when operating the machine

demand-side should providing facilities and the preparation projects as below: (After deliveryed the machine)

power source,water source,compressed-air line and related project

not listed connector device.

Needed materials for product testing

More inforamations please send inquiry to us.

Previous : Veinas EPE Foam Manual Cutting Machine Next : die-trimming Facilities
Copyright 2023-2024 - www.globalbiz8.com All Rights Reserved