Portable Integrated Modular Data Center System Two Row Support Customized
LRS-60-RRS (Cold aisle system)
Cabinet: 12 Units
UPS: 60 kVA( kW)
Cooling: 60+ 60 kW
Power distribution: 250A/380V
Redundancy: N+ 1
Traditional Data Center | Micro Data Center Smart Rack | |
•Construction time | 1-2 months | Within 7 days |
•Space | Subsystems such as UPS, air conditioners, cabinets, etc. need to occupy space independently | Modular rack-mounted deployment, highly integrated, reducing the area of the computer room |
•Integration | Multiple suppliers, product independent construction, independent management | One-stop supply, pre-integration, unified management |
•Compatibility | Multi-brand product integration, complex debugging, poor compatibility | Factory pre-integration, pre-commissioning, overall testing, high compatibility |
•Energy Saving | PUE value is 2.0~3.0, low cooling capacity utilization | PUE value≤1.2,energy save more than 50% |
•Stability | Easy to accumulate dust, hinder stable operation and reduce equipment life | Operation in a fully enclosed cabinet, high cleanliness, stable operation |
•After-sales | Multiple maintenance, unclear responsibility for relevance issues | Unified maintenance, multi-level maintenance program |