Home
/
Categories
/
Minerals & Metallurgy
/
Steel Structures
/
Prefab Steel Warehouse Structural
Prefab Steel Warehouse Structural
FOB Price 38 - 59 USD / Square Meter
MOQ
500 Square Meter
Port
Qingdao
Lead Time
45 days for OEM, 21 days for ready goods
China
Main Products : steel structure, steel warehouse, steel workshop, prefab warehouse
3109, Building 2, Minghui International, Shiling Road, Qingdao, Shandong, China Qingdao, Shandong
Prefab Steel Warehouse Structural Details
Brand Name
Senwang
Model Number
8618660230578
Place of Origin
China
Supply Type
OEM Service
Condition
New
Color
White
Prefab Steel Warehouse Structural Introduce

How much is the price for a steel structure workshop

The price of the steel structure workshop shall be determined according to the actual situation, including the design scheme, technical requirements, bay, span, crane, tonnage, etc. The most important thing is to depend on steel consumption. The steel structure workshop is mainly composed of steel columns and steel beam faceless wall systems. It will also be affected by regional steel and labor price fluctuations.

Among many influences, the price of steel fluctuates greatly, resulting in a large difference in the unit price per square meter of different steel structure plants.

The steel structure workshop has the advantages of light overall, saving foundation, using fewer materials, low cost, short construction period, large span, safety and reliability, beautiful appearance, and stable structure. Steel structure plants are widely used in large-span industrial plants, warehouses, cold storage, high-rise buildings, office buildings, multi-story parking lots, residential buildings, and other construction industries.

The construction of steel structure workshop is mainly divided into the following parts:

1. Embedded parts, (able to stabilize the plant structure)

2. Columns are generally made of H-shaped steel or C-shaped steel (two C-shaped steel are usually connected by angle steel)

3. The beam is generally made of C-shaped steel and H-shaped steel (the height of the intermediate product is determined according to the span of the beam)

4. Purlins: generally, C-shaped steel and Z-shaped steel are used.

5. Bracing, bracing, usually round steel.

6. There are two kinds of tiles. The first is single tile (color steel tile). The second is composite plate. (Polyurethane or rock wool is sandwiched between the two layers of color coated boards to warm in winter and cool in summer, which also has the effect of sound insulation and fire protection.).

Features of steel structure workshop

01 Strong seismic resistance

Most of the steel structure plants are made of light steel, and a triangular roof truss system will be used for the plant roof constructed of light steel. After construction, a "plate rib structure system" will be formed, which has the extremely strong seismic capacity and can be used in areas with more than 8 degrees of seismic intensity.

02 Strong wind resistance

The steel structure workshop is light in weight. Compared with the brick concrete structure workshop, the dead weight of the steel structure workshop is only one-fifth. And it can resist typhoon of 70 meters per second, with strong wind resistance.

03 High durability

The steel skeleton in the light steel structure used in the steel structure workshop has super anti-corrosion capacity. It can significantly increase plant life.

04 Strong thermal insulation capacity

The thermal insulation materials used in the steel structure workshop can effectively achieve the effect of thermal insulation.

05 Sound insulation effect is good

The sound insulation effect of the steel structure workshop is very significant.

06 Health

The material recovery rate of steel structure workshops is high, and other materials can also be recycled. All materials are green building materials, which meet the requirements of the ecological environment and are conducive to health.

07 Comfortable

The light steel wall adopts an efficient energy-saving system, with a breathing function, which can adjust the indoor air humidity; The roof has a ventilation function, which can form a flowing air room above the roof to ensure the ventilation and heat dissipation requirements inside the roof.

08 Fast

All dry construction shall not be affected by environmental seasons. For a building of about 300 square meters, it only takes 5 workers and 30 working days to complete the process from foundation to decoration.

09 Energy conservation and environmental protection

The materials can be 100% recycled to achieve green and pollution-free. High-efficiency energy-saving walls are used to achieve good thermal insulation, heat insulation, and sound insulation effects, which can reach the 50% energy-saving standard

Previous : Beam Steel Next : GB 1229 STRUCTURE NUTS: Class 8, 10
Copyright 2023-2024 - www.globalbiz8.com All Rights Reserved