Advance
Low price
Because of its breathable structure, underground water can be easily discharged and the demand of the foundation is quite low. Breathable plastic track can be applied on the concrete base, the small gap between the plastic track and the ground does not affect the use of the track.
Construction
Solid, no oil, smooth, no cracks, no bad side, no pockmark, the joints are smooth, no water blocking, density is not less than 95%, no loose, no waves, etc. The flatness is 3mm error under 3m ruler, there is a certain drainage slope.
(1) Base layer: It’s one-component binder, directly open the barrel(can add a small amount of diluents), apply all over the surface with rolling brush.
(4) White PU paint: Use as marking lines paint.
Usage date reference sheet
|
|
|
|
1 |
|
|
|
2 |
|
|
|
3 |
|
|
|
4 |
|
|
|
5 |
|
|
|
6 |
|
|
|
7 |
|
|
|
8 |
|
|
|