Home
/
Categories
/
Minerals & Metallurgy
/
Structural Steel
/
Road Culverts Corrugated Metal Pipe
Road Culverts Corrugated Metal Pipe
FOB Price
Port
Tianjin
Lead Time
30 days
China
Main Products : corrugated steel pipe, corrugated metal pipe, corrugated steel culvert
No.18 Xiangsu road, North industrial base, Hengshui City, Hebei, China Hengshui, Hebei
Road Culverts Corrugated Metal Pipe Details
Brand Name
QIJIA
Model Number
CMP D4000
Place of Origin
China
Supply Type
OEM Service
Condition
New
Road Culverts Corrugated Metal Pipe Introduce

Road Culverts Corrugated Metal Pipe are widely used in road culverts, highway culvert,bridge culvert, tunnel culvert and drainage pipe.

▶ TECHNICAL SPEC:

1.Material of steel plate: Q235 or SS400

2.Thickness of steel plate:1.5mm-8mm

3.Pipe Diameter: 400mm-9000mm

4.Corrugation Size: 68*13,125*25, 150*50, 200*55, 300*110, 380*140, 400*150

5.Depth of fill: 1.5-60m

6.Anti-corrosion treatment: hot dip galvanized ≥84μm(610g/㎡)

7.The second anti-corrosion: usually asphalt(bitumen) coated or epoxy resin coated.

8.Using life:≥100years.

9.Standard: JTT 791-2010 ,or AASHTO M36.

▶ TECHNICAL ADVANTAGES

1. High strength:1.5-3 times stronger than concrete

2. Light weight:1/15-1/5 weight of same specification concrete weight.

3. Long service life:normally more than 100 years

4. Low cost:when the span is larger than 1meter, the bigger the span is, the more obvious it shows

5. Convenient construction:no need of large machinery, only little manual operation.

6. Axial direction:can be used in a severe sedimentation area.

7. Shorten construction period for about half time, save labor charges.

8. avail to improving the structure of the soft soil foundation and the interlocking of the junction of the embankment, which improves the comfortableness of the car on the bridge.

9. Environmental, low carbon:Reduce or abandon normal construction materials, like concrete, yellow sand, cobblestone, and woods, which means a lot to environment.

10. Convenient maintenance, even no need to maintain under certain condition, lower the operating cost.

▶ PACKING & DELIVERY

-Packing Details: Standard export packing or as customer's requirement

-Delivery Time: 4000m within 1 month

-Delivery Term: FOB Tianjin Xingang port or CIF customer’s port

Previous : Ropeway Structure Next : Steel Wire
Copyright 2023-2024 - www.globalbiz8.com All Rights Reserved