Home
/
Categories
/
Chemicals
/
Adhesives & Sealants
/
Construction Adhesives
/
Wall Putty Powder
Wall Putty Powder
FOB Price
Vietnam
Main Products : maize, organic fertilizer, cashew, almond, hms
40 d2 street ward 25 Binh Thanh, ho chin minh city
Wall Putty Powder Details
Place of Origin
China
Wall Putty Powder Introduce

WALL PUTTY POWDER

Product features/advantages

Green environmental protection, Purify air,Easy construction & easy to polish,

Super waterproof, White and fine powder, Strong cohesive force

Product performance characteristics

1/Strong adhesive force, strong adhesion to walls and coatings.

2/Good crack resistance, good water resistance, anti - bacterial anti - mildew.

3/Good waterproof and air permeability, ensure the surface of wall and paint dry.

4/Feel natural, make sure the adornment effect of coating is reflected thoroughly.

Surface treatment

1/ The substrate and surface shall be firm and smooth, clean, free of grease, no wax marks and other loose objects.

2/The surface of the new plaster should be maintained for about 20 days before the putty is putty.

3/ If the wall is too dry before construction, the wall should be wetted in advance.

Operation process

1/Mix proportion: 20KG powder + 6/7kg water.

2/ Pour the water into the container first, then add the powder to the mixture, then mix it thoroughly with the blender until the powder is free.

3/After the first layer is finished, the second construction can only be carried out for about 4-6 hours after the first layer is finished.

4/Smooth the putty powder, the thickness is generally 1.0-1.5mm.

5/The putty can be painted after 7 days.

6/Putty layer after 24 hours of dry and solid, the visual temperature and humidity can be water conservation, maintenance 2-3 days.

Notes

1/The vertical and flatness of the substrate must be determined before construction.

2/Remember to mix the dry paste with water.

3/Under normal temperature, the putty should be used up within 3 hours.

4/Depending on the weather condition, it can be polished in one to two days. When it is polished, only the knife mark should be polished. Do not over-polish it to avoid the impact of the strength.

5/The shelf life is one year.

NO. Inspection items The measuring unit Inspection methods The technical requirements The inspection results Item Result
1 Container state   JG/T298-2010 No lumps Same Qualified
2 construction Scratch barrier-free Same Qualified
3 polishing Hand polish Same Qualified
4 Resistance to water ------------- GB/T1733-1993 48h no air bubbles, cracking and obvious powder Same Qualified
5 Dry time (surface dry) h GB/1728-1979 ≤5 2h43min Qualified
6 Early drying and cracking resistance ------------- JG/T24-2000 No crack Same Qualified
7 Bond strength Standard state MPa JG/T24-2000 >0.50 0.60 Qualified
After flooding >0.3 0.40 Qualified

Price

Delivery Port

Previous : CSA Cementious Self-Leveling Material Next : Hydroxypropyl Methyl Cellulose HPMC
Copyright 2023-2024 - www.globalbiz8.com All Rights Reserved