Yzjinsd Thick Turret Tooling Forming Mould Details
Brand Name
yzjinsd
Place of Origin
China
Supply Type
OEM Service
Condition
New
Color
Dependonwhethercoating
Product
Punchpress
Product Material
Steel
Shaping Mode
Punching Mold
Yzjinsd Thick Turret Tooling Forming Mould Introduce

A station center point thick turret tooling forming mould

Notice:

1. Different thickness of sheet can be processed, the maximum thickness is 6.0mm.

2. The forming angle is 90 degree, special requirements please illiminate.

3. Please adjust the punch press stroke or tool'sheight when process different sheet, punch without sheet is strictly preserved, otherwise the tools will be damaged.

yzjinsd B station flip over thick turret tooling forming mould

Notice:

1. Process punch holes need before flanging.

2. Process program must leave unload time, at the mouth of flanging has a slight slope.

3. Maximum process sheet thickness steel plate and aluminum plate 2.0mm, stainless steel 1.0mm; forming height H≥2T.

yzjinsd B station up round emboss thick turret tooling forming die

Notice:

1. Reasonable angle and round angle ensure a better molding.

2. The Special height, angle and round angle will increase the stress of materials.

3. For those higher and deeper molding, the materials should be smooth or lubricate the panels when processing.

4. The reasonable angle should be 90 degress.

5. The best height of the molding is less than 3 times of the thickness of the panel.

6. Process program must leave enought unload time.

yzjinsd B station bridge thick turret tooling forming die

Notice:

1. Bridge wideness must be larger than 1.5 times sheet thickness, Bridge widness must be larger than 1.8mm.

2. Process program must leave enough unload time.

3. The moulds are made according to the panels provided by customers, so it can not process different panels thickness.

4. Show clearly the smallest distance between the bridge-shape, we can design single beidge and double beidge tools, and forming top surface can be flat and arc.

5. Forming height: steel plate and aluminum plate are 1.5 times sheet thickness, stainless steel is 2 times, because of different sheet ductility.

6. Bridge has light sunken after forming, if thin sheet is narrow and long.

yzjinsd thick turret tooling forming mould knockout

Notice:

1. Please indicate forming direction clearly while ordering.

2. Multiple knockout hole can be ordered, such as double knockout hole, triple knockout hole and so on.

3. Punch without sheet is strictly preserved.

4. Punch and cut's depth is adjusted by regulating tools' height.

5. Check the lower die locating of punch press accurate or not.

6. While using, the panels that are thicker than the ordered thickness of tools can not be processed.

7. The height of molding will be higher than one sheet thickness. In case of leaving out position, a matching flush-trim die should be simultaneously ordered.

yzjinsd nibbling process strength thick turret tooling forming mould

Notice:

1. The nibbling process strengthen emboss is divided into linear type and curved type.

2. Linear type punch step can be adjusted according to the product's purpose. The suggest step is -mm.

3. The curved type will be limited by minimum arc when punching, minimum R be less than 2 times of sheet thickness.

4. The sheet will has slight mark of nibbling process impress after processing, reduce nibbling spacing can relive impress.

5. Tools and sheet's thickness are corresponding only, sheet of different thicknesss need different size tools, otherwise the pressing mark of nibbling process will be very clear.

6. Process sheet thickness: steel plate and aluminum plate 2.7mm, stainless steel 2.3mm.

7. Forming place should keep proper space with punch hole, sheet edge and clamping.

7. Forming place should keep proper space with punch hole, sheet edge and clamping.